Projects / Higher Education
Pool Filter Replacement at Hollinger Field House
Hollinger Fieldhouse is the University’s major basketball facility. It is also the primary North Campus indoor recreation facility for the University. It is heavily used...
Graham Natatorium
This fast paced construction project commenced July 2014. Work consisted of draining the 800,000 gallon pool, removal and replacement of the existing diatomaceous earth s...
Campus Geothermal Utility Conversion
Our work on this project consisted of the installation of steam and hydronic boilers and supporting equipment and systems in the Borough of West Chester in Chester County...
Killinger Hall – Natural Gas Boiler Installation
This project included supplying all the necessary material and labor to install new boilers at the University’s Killinger Hall. The work included demolition of existing e...
Geothermal Phase 2 Distribution Piping - North Campus
This project for West Chester University included the complete installation of main distribution HDPE double‐piped trenching with steel piping routed through existing ste...
S.T.E.M. Complex Center
In an effort to enhance education in Science, Technology, Engineering, and Mathematics, Delaware County Community College built the $60 Million S.T.E.M. Complex Center. G...
Career & Counseling Center – HVAC Renovation
This project was completed at the College’s South Media Line Road location in the Career & Counseling Center. The work included the removal and replacement of existing e...
Nursing Simulation Lab Renovations
The project included the renovation of the existing nursing simulation and respiratory therapy labs that were designed for both class lecture and practicum use. GEM Mecha...