Pool Filter Replacement at Hollinger Field House

Pool Filter Replacement at Hollinger Field House

Hollinger Fieldhouse is the University’s major basketball facility. It is also the primary North Campus indoor recreation facility for the University. It is heavily used day and night.

Work included demolishing of existing filter unit, piping/valves, pump, strainer and air compressor, flowmeter, housekeeping pad under existing pump and air compressor. Existing water fount was removed; doorway opening was enlarged, new door and frame was added.

Furnished and installed the filter, pump, VFD and strainer, valves and gears, PVC piping, hangers/supports, flowmeter, flow indicator. The existing chemical pump and storage tank were relocated.

No Extra Photos

No Extras Photos for this Project.

PROJECT OWNER

West Chester University

ARCHITECT / ENGINEER

Wallover Architects, Inc.

PROJECT COMPLETED

10/31/15