The project included providing and installing a modular chiller, air cooled condensing unit, piping, valves, and insulation on the roof and in the boiler room at Henderson High School. This single prime contract included Plumbing, Electrical, and HVAC components including all materials, labor, supervision, field design, installation, setup, controls, commissioning, licensing and training.
No Extra Photos
No Extras Photos for this Project.
​
​
​
​
​
PROJECT OWNER
West Chester Area School District
ARCHITECT / ENGINEER
Moore Engineering
PROJECT COMPLETED
10/31/15