Geothermal HVAC Equipment
The scope of this project consisted of the removal and disposal of air‐conditioning units and the installation of four geothermal heat pumps located in the Township building. Heat pumps included commercial programmable thermostats. The work included all required wiring, cables and valves to properly connect new units to existing system and ducts. GEM also provided all pump testing.
No Extra Photos
No Extras Photos for this Project.
PROJECT OWNER
Upper Providence Township
ARCHITECT / ENGINEER
Kelly & Close Engineers
PROJECT COMPLETED
2/29/12