Boiler System Condensate Tank Project
The project at Springfield High School, 49 West Leamy Avenue, Springfield, Pennsylvania consisted of the isolation, draining and removal of a 515 gallon steel condensate receiver tank and replacing it with a new stainless steel tank of the same size. All connections were reutilized to provide a complete and operational condensate/vacuum water system. In addition GEM replaced the duplex vacuum receiver tank, associated vacuum pumps and accessories, as well as the control panel with associated controls.
No Extra Photos
No Extras Photos for this Project.
​
​
​
​
​
PROJECT OWNER
School District of Springfield Township
ARCHITECT / ENGINEER
Shiller and Hersh Assoc.
PROJECT COMPLETED
11/30/11