Projects / K-12 / Springfield High School – Pool Water Boiler Replacement

Springfield High School – Pool Water Boiler Replacement

GEM was responsible for disconnecting and removing the existing pool water heater and related components. We supplied and install a new pool heater and all required piping, valves, ductwork, and electrical equipment. The new boiler was interfaced with the pool water temperature settings on the adjacent unit. System testing and leak testing were completed. The project was located at the Springfield High School Pool, 1801 Paper Mill Road, Erdenheim, PA.

No Extra Photos

No Extras Photos for this Project.

PROJECT OWNER

School District of Springfield Township

ARCHITECT / ENGINEER

Schiller and Hersh Associates

PROJECT COMPLETED

5101 Birney Highway
Aston, PA 19014

Contact Us

email info@gemmsi.com

office (610) 361-9667

fax (610) 361-9677