Boiler System Condensate Tank Project
The project at Springfield High School, 49 West Leamy Avenue, Springfield, Pennsylvania consisted of the isolation, draining and removal of a 515 gallon steel condensate receiver tank and replacing it with a new stainless steel tank of the same size. All connections were reutilized to provide a complete and operational condensate/vacuum water system. In addition GEM replaced the duplex vacuum receiver tank, associated vacuum pumps and accessories, as well as the control panel with associated controls.